Showing posts with label changing ac phase. Show all posts
Showing posts with label changing ac phase. Show all posts

Monday, 23 April 2012

Fitting the phase shift Transformer

Another rather productive day. On holiday at the moment so spent a few more hours on the Tesla build. Today I managed to get the step down tansformer mounted in the base of the phase shift module.
As you can see it mounts directly onto the base disc. If you remember the step down transformer was originally mounted on the second level of the Tesla base. The pic below shows its original position.
I removed the whole module including the perspex base. After separating the transformer from the base I used the old base to mark drill points onto the base disc of the phase shift module. After drilling these holes I fixed the transformer to the base disc using the original ceramic pillars.
This left a couple of jobs to finish up. Two M12 flex glands were fitted by drilling two 10.7mm clearance holes and tapping out to 12mm. I also drilled six 12mm holes in the top disc, these are purely for ventilation. There are 7 similar holes in the base around the transformer and as the base stands on small cork pads air should be able to circulate up through these holes and out the vent holes in the top.
I took a picture of the main power module and the phase shift module together just to show you how I have tried to design them with the same look.
Still have wiring to finish up and few other touches to the phase shift module but I think I have achieved a matching module.
Here's the module that replaces the repositioned step down module. It's a rather large 40microfarad capacitor and is part of the phase shift circuit.
The capacitor has a central M8 mounting bolt which screws into a vertical perspex 8mm thick square. This square is bolted to the perspex base and is reinforced by a secondary perspex square flush up against it and also bolted to the base.
Again, just a bit of wiring needed to finish off.

If you like this blog you can show your support by one or all of these. 1. +1 my blog and email it to a friend. 2. Follow me.... It's good to know someones interested. 3. Leave a comment.... All are appreciated.

Sunday, 22 April 2012

Finishing the Phase Shift module casing

Hi Tesla fans. Today I spent several hours on the phase shift module case. Last post described marking out and drilling the top and bottom perspex discs. I've not been looking forward to the next task but today I decided to get on with it. The phase shift module will contain the 2 Amp Variac and the 110V step down transformer, this means the perspex tube required is quite tall at 195mm. This presents a problem as it's too tall to fit under the chuck of my mill/drill and that means I would have to freehand drill the holes to take the 3mm bolts that fasten the end discs onto the tube. Doesn't sound to bad? Well remember that the perspex tube walls are 5mm thick that only leaves 1mm either side of the 3mm bolts. Now thats why I haven't been looking forward to this. I picked 15mm long M3 socket head screws to use to bolt the top 8mm thick perspex to the tube. This meant they would only protrude 7mm into the tube walls and the holes required for tapping could be kept reasonably short. Drilling went pretty well. I taped the top disc to the tube end so I could use the pre-drilled holes in the disc. I found the best way to keep as vertical as possible was to stop frequently an reposition 90 degree to the work. That way I could try to keep vertical in multiple planes.
The resulting tap holes were pretty tidy, at least none of them had broke through the tube walls due to being so far off the vertical. The 8 shallow holes were tapped out to take the M3 bolts (stainless of course).
My last excuse for a lull in my Tesla activities was the purchase of a Sony PS Vita. This months excuse was a little more impressive, took a quick snap of it before attempting the holes for the base disc.
A Peugeot RCZ GT 200. Second childhood, third mid-life crisis. Whatever!!
The base was taped to the tube and drilling was just a re-run of the top. The base disc is black 5mm perspex, black as clear would be pointless for the base, slightly thinner than the top as the top needs extra thickness to support the carry handles.
Here's the assembled phase shift module case. Next to it are a couple of lengths of 1/2" diameter aluminium rod. I will use these to make the carry handles. Below is a pic of the main power module containing the 10A Variac. I am trying to create the phase shift module in the same style.
The 2 aluminium rods were cut to 108mm and 17mm long flats were milled on each end. I drilled 6mm holes central on the flats on each end.

The handle will be supported on 22mm lengths of 6mm ID 8mm ED aluminium tubing. To allow the handles to sit flush on the tubes 8mm seats were milled on the underside of the handles centred on the 6mm mounting holes.
Below is an assembled handle. The supporting tubes fit nicely into the 8mm seats. I will be using socket head screws in the final asssembly (stainless of course).
I span up the handles on my lathe and used varying grades of emery clothes to create a nice brushed finish.
I fitted the 2A variac to the top disc incorporating the handles. The plastic bolts were the only long bolts I had to hand but I now know I need 4 60mm socket head bolts for the final assembly (stainless of course), off to ebay to source some.

If you like this blog you can show your support by one or all of these. 1. +1 my blog and email it to a friend. 2. Follow me.... It's good to know someones interested. 3. Leave a comment.... All are appreciated.

Sunday, 11 March 2012

Building the Phase Shift Module

Hi there, it's been over a month since I last posted (blaming the purchase of a PS Vita). Haven't done anything with the tesla so you've not missed anything. Last post I did was about the 2 Amp variac purchased for phase shifting. I am still in phase shifting mode so I bought some perspex to house the new module.
The phase shift module will be housed in the perspex tube and will look similar in design to the tesla power source module I constructed. It will contain the 2 Amp variac and the 240v to 120v step down transformer that, at the moment, is mounted on the second level in the tesla base. This change in design is due to some advice I obtained from the very clever people at http://www.pupman.com. The advice was to step down the voltage to 120v before the phase shifting variac, hence the step down transformer will have to be external of the main tesla and it makes sense to house it within the new phase shift module.
Above is a pic of the present situ of the step down transformer. This will me removed and replaced by a module that houses the large capacitor needed in the phase shift circuit. Tonight I started on the housing for the new phase shift module. As usual the plastic was masked up ready for marking up and drill. The top and bottom of the housing will be held in place by 3mm allen bolts so first I marked up the holes needed.
I marked up both discs, then realised I could tape both discs together to drill at the same time. Both discs are 185mm diameter, the top disc is clear 8mm thick, the bottom is black and 5mm thick. I went for 8mm thick on the top as this disc will have the rather heavy 2 Amp variac bolted to it.
Here's both discs taped tightly together ready for drilling the 8 3mm clearing holes for the bolts.
Drilling went without any mishaps. If you want a few tips on drilling perspex take a look at my Drilling and Tapping Perspex page. The top disc needs an additional 10mm hole drilling dead centre to allow the variac shaft to pass through. After drilling this hole it was possible to rest the variac on top of the disc with the shaft passing through the hole to allow the marking of the four 6mm holes needed to mount the variac to the perspex disc.


If you like this blog you can show your support by one or all of these. 1. +1 my blog and email it to a friend. 2. Follow me.... It's good to know someones interested. 3. Leave a comment.... All are appreciated.