Sunday, 11 December 2011

Marking out and drilling mounts for the primary

Today I spent a few hours progressing with the primary coil. I needed to mark out the positioning of the 8 primary support combs. These will be attached to the underside of the large anti-strike disc by 3 nylon bolts per each comb. I had already masked up the anti-strike disc to protect it and to allow marking out, I marked up 8 "spokes" onto the disc by taping the disc down to our glass dining table and taping a 360° protractor into the centre cut-out.
The position of the 8 spokes could then be easily marked out using a long metal rule placed over the relevant degree markings and lined up with the dead centre.
Also mounted to the underside of the anti-strike disc will be 16 evenly space strike rail holders around the perimeter so I marked on another 8 spokes at 45° intervals between the primary coil combs. With all the spokes marked up I could decide on the nylon bolt positions and mark them out for later drilling. 
Next job was to mark out the primary support combs. I don't want to "notch out" the combs as is the usual way to support the copper pipe of the primary. This method means you have to either glue or zip tie the tubing down, neither of which appealed to me. I plan to drill "full" holes into the combs and thread them onto the copper coil.
If you look at the coil plan above (or into my eyes, not around my eyes) you can see that the positions for the holes in each comb will be different. For my coil there is 8mm space between each rotation of the coil and the diameter of the copper tubing is 6.5mm so the holes in the combs need to be 14.5mm apart (centre to centre). This measurement is the same for each comb. As you move around to the next comb the spiral moves out by 14.5mm divided by 8 (1.8125) so there is an offset of 1.8125mm as you move around from comb to comb. You can avoid this complication by just moving the combs outwards by the same value when fixing them in place but I wanted all the combs to be the same distance from the secondary coil.
All the combs were masked up in the usual manner and then through carefully measuring my full scale primary plan I determined the position for the hole for the innermost coil on comb number 1. It was the easy to mark the position for the 1st hole in comb number 2 by adding 1.8125mm. And so on up to comb number 8. I didn't bother marking any subsequent holes onto the combs as I decided to fire up the digital vernier scales on my milling machine and locate them by just adding 14.5mm each time.
Not the best video but its really hard trying to film while drilling. Think I might invest ia a small tripod for my little Sony Bloggie.
I set up the milling machine so each perspex comb could be clamped in the the same place with an 10mm piece of pine stripwood underneath to prevent the drillbit chipping the back of the perspex as it breaks through. I positioned the bed so the drill bit was directly over the datum mark for the first hole. The hole was drilled and then the bed was moved 14.5mm to the left and the next hole drilled and so on.
I jotted down all the datum points as I drilled the first comb so I could use the info for the rest of the combs. And about 140 holes later......
Here's the drilled combs underneath the anti-strike disc. I have drilled all the necessary pilot holes in the strike disc, this will make it very easy to mark up the 3 bolt holes onto each comb by simply sticking a pencil through the pilot holes in the anti-strike disc.

Thursday, 8 December 2011

Attaching the Toroid to the Secondary Coil

I have been considering how to attach the toroid to the secondary coil. This involves a physical connection to hold a rather expensive gorgeous hand spun aluminium toroid and an electrical connection between the toroid and the secondary coil. I would like to be able to quickly remove the toroid for transport and access purposes but without risking damage to any electrical connections. I have come to the conclusion that the secondary coil should have a permanent threaded conducting protrusion on its top cap which is electrically connected to the secondary coil. The toroid simply slots over this protrusion and is secured by a threaded knob.
Here's the top of the secondary, the central hole is 10mm and was drilled originally to mount the secondary coil onto the winding jig shaft (a 10mm threaded rod). I thought 10mm was a little excessive as a mount for the toroid so decided to bush the hole down to 8mm with a piece of brass rod.
I turned a flange on one side of the insert. This would sit on the under side of the secondary top cap.
Here's the bush fitted, admittedly the wrong way, just making sure it was a snug fit.
Ok, so I now have the top cap ready to accept some kind of 8mm bolt that will protrude upwards. I need to do 2 more things. Firstly, I want to add a little height to the top of the secondary to lift the toroid,  secondly, I need to make this protruding bolt captive so when I undo the fastening for the toroid this bolt doesnt spin or release and drop down the inside of the secondary. To cover off both these requirements I am going to use two pieces of perspex. The first is a 100mm diameter 15mm thick clear disc ordered from my favourite plastic supplier Trent Plastics.
As you can see I have masked the disc up and drilled a central 8mm hole. This disc will sit on top of the secondary coil top cap. The second piece of perspex required is exactly the same size except it has a 25mm central cut-out.
These two discs will be bonded together as shown in the mock up below.
The larger hole in the top disc will provide clearance for the nut which will make the toroid mounting pin captive. OK, now for the mounting pin.
I cut a length of 16mm diameter copper rod, started off with about 10cm. The shank of the pin needed to be 65mm long and 8mm in diameter.
Turning the copper rod down to 8mm was down using a type 5 parting tool. Probably not the best tool to use but I always have the most success with this type. The material was removed in 0.4mm passes, I didn't want to risk any deeper cuts as it's quite a long shaft to turn and copper is pretty soft. I had an experience in the past where the tool dug in and the work was completely destroyed.
The toroid will be secured in place with an M8 threaded knob so I needed to cut some threads into the pin. There's quite a lot of info on the web about cutting threads onto copper rods, lots of comments about poor results and differing views on cutting methods and lubricants. I used plenty of WD-40 and patience. Don't try to cut too much thread in one go, I found it best to cut 1/8 of a turn each time and reverse the die 1/4 turn back every time. Use plenty of lube and clear swarf from the die when needed.

Here's the assembled mounting pin.
The copper lug will provide electrical connection to the secondary coil. The nylon M8 nut in the top pic will be replaced with a stainless steel version.

Saturday, 3 December 2011

Starting on the Primary Coil

Spent the last few weeks decorating the lounge, those of you who have followed my blog may have spotted the rather flowery decor in some of the pics, for this I apologize but can now confirm that the decor is a little more up to date. Now onto the primary. As per the original plans from Tesslastuff.com I acquired a fifty foot length of 1/4' copper tubing. This can be sourced from many places, I picked a well priced listing on ebay from a seller with a healthy feedback score.
I have spent a long time deciding on the final design of the primary coil, the plans from Tesslastuff.com give you the basic idea and all the correct measurements but, as usual, I wanted to enhance the design with my over engineering. After reading several blogs and coil build diaries there seemed to be two ways to help prevent primary coil strikes (streamers hitting the primary coil- not good). Firstly to fit a ground rail around the primary and secondly to completely cover the primary with a non-conductor. So I decided to do both.
Above is my solution to covering the primary coil. It's a 5mm thick perspex disc with an external diameter of 900mm and an internal diameter of 170mm. The cut-out allows the secondary coil to pass through and as this disc is prominent I want it to be aesthetically pleasing so paid extra for the inside and outside edges to be polished. Here's another pic to give you an idea of the disc size next to the tesla base (room still with old decor).
I would also need some way of supporting the copper tube spiral of the primary. Most people used strips of plastic with evenly spaced cut-outs with accepted the coils of the primary. The coils were secured with glue or by zip ties. I didn't like the idea of glue cos of it's general messiness which doesn't go well when combined with lovely clear perspex. The other option of zip ties just didn't look that good. The best looking install I saw was to use nothing to hold the coils in place. The coil passes through holes drilled in the supports, very neat but a lot harder to achieve. I ordered the material needed for the supports.
These were 8 pieces of 250mm X 30mm X 10mm clear perspex with the top and bottom edges polished.

Sunday, 30 October 2011

Still finishing the Secondary

Managed to get the holes drilled to mount the secondary coil to its base. I had to drill them free hand as the base is too large to fit under my milling machine. There are eight 8mm holes.
Here you can see the secondary coil mounted on the base. The copper lug on the right is attached underneath the head of a steel bolt and this will make the secondary coil electrical connection to ground.
The end of the secondary is soldered into a small piece of 1/8" copper piping which provides a better material for the copper lug to clamp onto.
The eight bolts pass through the base and are secured with matching nuts on the underside. Another copper lug will be placed on the steel bolt to allow connection to ground.
Coco was not at all interested in the secondary coil base.
I think I will run the ground connection from a copper lug on the steel bolt out to one of the pairs of supporting perspex columns and down into the base.


If you like this blog you can show your support by one or all of these.


1. +1 my blog and email it to a friend.
2. Follow me.... It's good to know someones interested.
3. Leave a comment.... All are appreciated.

Wednesday, 26 October 2011

Primary thoughts

As the secondary coil is pretty much finished I have already been thinking about construction of the primary coil. Both coils will sit on a perspex 50cm 12mm thick disc which is supported above the second layer of the main module on 8 30mm diameter 20cm long perspex pillars.
The second level contains the MMC module, the spark gap module and a step down transformer module for the spark gap motor. All modules are mounted on ceramic standoffs.
I have yet to finish off wiring and the support disc is not yet fitted. As you can see I have coated it in masking tape ready for marking up the holes for drilling.
The pillars are drilled out to 5mm and then threaded to take M6 bolts. If you want some advice for drilling and tapping perspex takes a look at my Drilling and Tapping Perspex page.
The primary and secondary coil will sit on the top perspex disc (covered in masking tape above). At this point I have decided to upgrade the design from the original plans (yet again). I thought it would be a good idea to mount the primary coil underneath a perspex disc which should help prevent strikes to the primary coil. Also I heard if you do this any strikes that hit the perspex create an interesting effect as they spread out over the perspex. I will install a more traditional strike rail around the edge of this protection disc. The disc diameter was decided at 90cm and it would need a 170mm diameter central cut-out to allow the 150mm diameter secondary coil to pass through.
And here it is. Ordered from Trent Plastics, it turned up at work this morning. Took me about 10 minutes to remove the 3 layers of cardboard packaging.
The thickness is 5mm and I paid extra to have the inside and outside edges polished. It's a big piece of plastic and does flex a little, but there will be 8 radial combs from the centre outwards to support the primary coil and these will add extra stiffness.

Saturday, 1 October 2011

Secondary top finished

Have just completed the top end disc for the secondary coil. It's pretty much a carbon copy of the base disc but obviously doesn't require the extra holes for mounting to the base.
As well as the 8 4mm holes around the circumference there is also a central 10mm diameter hole which serves two purposes. Firstly, it allows the top-load to be electrically connected to the coil on the secondary. Secondly, in conjunction with the same hole in the base disc, it allows the whole secondary coil assembly to be mounted on the 10mm shaft of my coil winding jig.
The next job is to wind the coil. This will be the first time winding such a large coil but hopefully should go OK.

Friday, 30 September 2011

Secondary base finished

Just got in from the garage.  Spent a couple of hours drilling and tapping the holes in the secondary coil and the bottom disc.
The eight holes around the perimeter are tapped to accept 20mm M4 bolts which will pass through corresponding 4mm holes in the secondary coil. The other eight holes started as 7mm plain holes and were then tapped to M8. They will be used to bolt the secondary coil down to the base.
The holes were drilled with the disc in situ inside the secondary coil. The drill size required is 3.3mm. After drilling the components were separated and the disc tapped to M4. The 3.3mm holes in the secondary were opened up to 4mm.
Here you can see the base disc bolted inside the secondary coil. Think it looks great and, as usual, completely over engineered.
I have used nylon bolts, not sure if it would be OK to use metal so opted for nylon.

Tuesday, 27 September 2011

Second Thoughts

After deciding to upgrade to a 6" secondary coil I got on the phone to Trent Plastics to order the relevant pieces of perspex. These consisted of a 810mm length of 150mm diameter clear acrylic with a 3mm thick wall and two 144mm diameter 15mm thick clear acrylic discs which will be inserted inside the ends of large tube and form the top and base of the secondary coil. I normally deal with a guy called Levi who is always on the ball, I was a little concerned that the discs would not be a good fit inside the 150mm tube due to variations in wall thickness that occurs in extruded acrylic tube so I asked Levi to check the fit of these discs inside the large tube. Three days later and a long cardboard covered tube turned up. I checked the fit of the discs and they were a perfect close push fit inside the large tube.
The above pic shows the 150mm diameter tube, it still has the protective plastic film and I have added masking tape so I can mark the position of the 8 4mm holes that will accept the M4 nylon bolts to locate the top and bottom perspex end caps.
Here are the 2 end caps. They are sitting on a 12mm thick 500mm clear acylic disc which will be the base for the primary coil. The disc on the left is for the bottom of the secondary coil and will be secured to the primary coil base by 8 M8 40mm Nylon bolts. You can see I have already marked the disc for drilling.
The holes need to be drilled to 6.8mm and then tapped for the M8 bolts. This means the bolts will be captive in the secondary coil base which is needed as there will be no access to the bolt heads once the secondary coil is assembled.
Assembled so you get the idea.
The base disc will attach to the secondary coil tube by 8 X 20mm M4 nylon bolts which will be located equidistant around the circumference at a height of 7.5mm.
Starting to get worryingly large!!

Sunday, 4 September 2011

First layer plastic surgery

Spent a couple of hours in the garage drilling the various mounting holes in the base. 4 X 6mm holes for the neon transformer and 16 X 4mm holes for the Terry filter, the emf filter and the mains connector module.
Another 12 X 4mm holes were needed to mount the 10x10mm perspex square rod that runs around the perimeter of the base.
These 10x10mm perspex rods provide a means to screw the side panels onto the base.

Wednesday, 20 July 2011

Looks a bit like ORAC

I have decided to enclose the whole assembly with clear 10mm perspex. Maybe this may help prevent strikes but mainly I just think it will look good. I will have to sort out some ventilation, perhaps a fan mounted in one of the perspex walls, not sure yet. For those of you who remember Blakes 7, I can't help thinking about ORAC as I envisage the finished enclosure.



I am using 10mm square rod as seams on the inside of the side walls which allows me to bolt the box together rather than glueing.





Our glass dinning table made a great flat surface to align the side panels.



- Posted using BlogPress from my iPad